[1]
E. Harsiga, T. Toha, and S. Komar, “CALCULATION OF PIT 2 PRODUCED OVERBURDEN VOLUME AND THE ANALYSIS OF PREPARATION OF PIT 1 MINE VOID UTILIZATION AT SUPAT BLOCK PT. BATURONA ADIMULYA MUSI BANYUASIN, SOUTH SUMATERA”, indones. j. env. man. sus., vol. 2, no. 2, pp. 42-47, Jun. 2018.