Harsiga, E., Toha, T., & Komar, S. (2018). CALCULATION OF PIT 2 PRODUCED OVERBURDEN VOLUME AND THE ANALYSIS OF PREPARATION OF PIT 1 MINE VOID UTILIZATION AT SUPAT BLOCK PT. BATURONA ADIMULYA MUSI BANYUASIN, SOUTH SUMATERA. Indonesian Journal of Environmental Management and Sustainability, 2(2), 42-47. https://doi.org/10.26554/ijems.2018.2.2.42-47