[1]
Harsiga, E., Toha, T. and Komar, S. 2018. CALCULATION OF PIT 2 PRODUCED OVERBURDEN VOLUME AND THE ANALYSIS OF PREPARATION OF PIT 1 MINE VOID UTILIZATION AT SUPAT BLOCK PT. BATURONA ADIMULYA MUSI BANYUASIN, SOUTH SUMATERA. Indonesian Journal of Environmental Management and Sustainability. 2, 2 (Jun. 2018), 42-47. DOI:https://doi.org/10.26554/ijems.2018.2.2.42-47.